Rock Stock Channel

E407 - Does Surge's PFS Validate the Thacker Pass Second-Mover Thesis?

Published: October 7, 2026

Duration: 31:21

Surge Battery Metals (TSXV: NILI) Chairman Graham Harris and lithium expert Iain Scarr join Howard Klein and Matt Fernley to break down the Nevada North pre-feasibility study.

They discuss Nevada North’s grade, recovery, operating costs, second-mover advantage behind Thacker Pass, technical risks, project financing and what still needs to be proven before construction.

Could Nevada North become the next major US lithium project?

PFS Announcement: https://surgebatterymetals.com/news/surge-announces-positive-pre-feasibility-study-at-nevada-north-after-tax-npv8-of-us-9.81-billion-after-tax-irr-of-23.6-and-operating-cost-of-us-4-719-tonne-lithium-carbonate

Follow Surge Battery Metals: LinkedIn (Graham Harris) - https://www.linkedin.com/in/graham-harris-bb904057/ LinkedIn (Ia...